Homewood Suites Hotel – Oxnard, California
As Project Manager, Hoff supervised the design and preparation of tentative maps, construction documents, hydrology analyses, and permit approvals for this four-story hotel.
Vintage Paseo, USA Properties – Simi Valley, California
Hoff served as Project Manager for this $15 million senior affordable-apartment project, which was developed as part of a larger project. He prepared preliminary plans for City Council approval, as well as sewer, water, storm drain, and grading plans for construction. The project was delivered on time, which was essential due to receipt of government funding.
Thousand Oaks Surgical Hospital – Thousand Oaks, California
Mr. Hoff was the project manager for the Thousand Oaks Surgical Hospital in Thousand Oaks, CA. This project had a medical office component and an elective surgery hospital. A challenging aspect of project was that the office component was under the review of City of Thousand Oaks and the hospital portion was reviewed by OSHPD.
RiverPark Master Planned Community – Oxnard, California
Hoff served as a Project Manager for this 700-acre mixed-use development located in Oxnard, California. The master plan project comprised 2,800 residential units and more than 2.4 million square feet of office/commercial space. Designed as a compact, cohesive, complete mixed-use community, the project included five residential neighborhoods, office and retail centers, hotel/convention center, elementary and secondary schools, and playfields and parks. Hoff provided engineering and construction support services for the infrastructure and grading of the community and amenities that are strategically linked by a project-wide system of open space, pedestrian, and vehicular circulation elements. His main responsibility was overseeing completion of precise grading plans for the first three tracts of the residential portion of the project. He was also responsible for several other subsidiary plans, including the welcome and sales centers, and site approvals from the City.
Dos Vientos, Miller Brothers Investments, LLC – Newbury Park, California
Hoff served as Project Manager for this development of 2,346 homes, multiple parks, school, and commercial center. He prepared closeout documents for several tracts, full construction documents for two tracts, and extensive plan amendments to change the densities and development conditions for multiple parcels. He restored the schedule to the previously behind-schedule project.
Million Air FBO and Hangar Facility, San Bernardino International Airport – San Bernardino, CA
Hoff is serving as Project Manager on this project that has recently begun construction. The project is being constructed on a vacant concrete ramp area of the San Bernardino Airport that was previously an Air Force facility. A hangar, FBO and a Customs building are being constructed.
There is also an office facility being added to the existing neighboring hangar. As the existing concrete ramp surface was over one foot thick, there was a substantial cost savings by retaining as much of that surface as possible. Value Engineering of the site plan provided a large cost savings for the owner. The plans required coordination between the airport authority and the city, as well as two ownership groups, to determine the best utility layouts.
John Wayne Airport Museum Hangar, Martin Aviation – Orange County, California
For this hangar project, Hoff served as Project Manager, providing grading, sewer, and storm drain design. The project involved construction of a museum hangar to house vintage and antique aircraft. The hangar was constructed adjacent to an existing hangar and required ramp improvements to the new hangar door. The existing site did not include storm drain facilities and the current drainage flowed onto a neighboring property. Grading and storm drain designs had to be implemented to change the drainage pattern, treat the water to current standards, and provide a design that complied with airport and county regulations.